Little video of some of the types of installs we do for clients.

Should always plan ahead.

A 1600s building so everything needed to be spot on from our side.

2 visits to this one to get the numbers right as a lot going on.

PB18.90 collapsed down to get through 1.97 arched door.
Numerous steps to get down.
Tracked down a slope to get turned then up and in through a 1m gate.

Once through needed to slide machine to the left sufficiently to enable to set up the legs.

My son was working a night shift last night so I did the install on my own.
All sorted and we are ready for action.